IMG_9905 (768x1024)The first time I put an egg on the island, it rolled off. Splat. I thought “huh” and that was that. After this started happening frequently, I started to wonder if something wrong with the island. And then my favorite rollingĀ  pin fell off and broke.

Not sure if I didn’t trust my instincts or if I just didn’t want to deal with a potentially major repair issue, but I didn’t do anything about it until a month later, when I was sitting on the couch, looking back at the kitchen and thought the island looked like it was tilting slightly to the right. My husband got out a level to confirm it was slanted (off by a little less than a quarter inch) before we called Tim, our Project Manager on the remodel (and Tim, if you think you’ve gotten out of an interview, think again!).

It was a relatively easy fix (well, I don’t know how easy it actually was, but it didn’t take Tim and Marty, the carpenter, long to fix it). They were able to raise the island and put a shim in it, which was covered up by the toe-kick. It’s all good now; no more runaway eggs.

Kitchen Remodel – Week Three: Inspections, Insulation, Drywall

Week three of the kitchen remodel consisted of electrical and plumbing inspections, insulation, relocating the laundry chute and installing drywall.

IMG_8874 (600x800)IMG_8897 (588x800)IMG_8875 (593x800)The insulation was done by this guy (dang, I wish I could remember his name – Dale?), who also handled our demolition the first week. He’s a really nice guy and very fond of Sam the Labrador.

Sam, by the way, is so used to people coming in and out of the house, he barely gets up anymore to greet anyone. And he’s the only one who can sleep through the noise. His new hangout spot is none other than the floral couch (his old spot was the leather armchair in the family room, which is now in the basement and only accessible via the back of the house).

IMG_8912I covered the couch so he wouldn’t dirty it all up and am hoping that once the remodel is done, he’ll go back to his old spot (and if he doesn’t, he’ll be forced to. sorry, buddy). Yep, the zebra rug is still there (if you haven’t figured it out by now, remodel = expensive). But look – we got a coffee table! It belonged to my mother-in-law’s parents andĀ  it was hanging out in her garage, waiting for a home. It’s a little wobbly, but usable and we love it.

The electricians were here early in the week, finishing up with socket placement and all the other wires for the fridge, and lighting. The outdoor sconce placement was discussed, decided on and marked.

IMG_8876 (600x800)The inspections went well (to my knowledge), but they did insist that we install new smoke detectors throughout the house. We had battery operated ones, so the guys took those out on Wednesday and put in new ones upstairs and downstairs that are hardwired throughout the house. We also had to purchase a carbon monoxide plug-in.

IMG_8895 (600x800)The laundry chute was relocated. Old location is the lower rectangle, new location is the higher rectangle. It will still be accessible, but via a cupboard instead of on the backsplash, where it was before.

(Note: see the hollow area to the left of the laundry chute? That’s unused space under the stairs. Wish we could’ve figured out a way to use but…alas.)

IMG_8904 (600x800)

Standing in the family room looking at the kitchen.

IMG_8902 (600x800)

There will be built-in shelving on either side of the fireplace.

IMG_8901 (600x800)

Standing in the kitchen, looking at the family room. Fireplace on right.

Finally, some light! With the drywall up, the room is instantly brighter (and what the heck color to paint the walls?!? STILL trying to figure that one out. Any ideas?).

IMG_8906 (2) (600x800)Why use a ladder when you have stilts? Drywall was prepped today (I think they’re done? I’m not 100% sure).

Next week is going to be an exciting one….cabinets arrive! Also, I think they’re going to put in a zippered wall (vs. a cardboard and Visqueen wall that obviously we can’t walk through), which will be possibly even more exciting than the cabinets at this point because I am freezing from having to walk all the way around the house to get to the basement (laundry, filing cabinets, printer, random boxes – all of which I use often). It was 34 degrees this morning when we took the girls to school. Yikes.

Which reminds me of another thing I’m looking forward to when this project is done – getting to use our heated garage. My car has been parked outside during the remodel and it is cooooold in the mornings. So much to look forward to (and so thankful that these are my hardships at the moment).