Kitchen Remodel – Week Three: Inspections, Insulation, Drywall

Week three of the kitchen remodel consisted of electrical and plumbing inspections, insulation, relocating the laundry chute and installing drywall.

IMG_8874 (600x800)IMG_8897 (588x800)IMG_8875 (593x800)The insulation was done by this guy (dang, I wish I could remember his name – Dale?), who also handled our demolition the first week. He’s a really nice guy and very fond of Sam the Labrador.

Sam, by the way, is so used to people coming in and out of the house, he barely gets up anymore to greet anyone. And he’s the only one who can sleep through the noise. His new hangout spot is none other than the floral couch (his old spot was the leather armchair in the family room, which is now in the basement and only accessible via the back of the house).

IMG_8912I covered the couch so he wouldn’t dirty it all up and am hoping that once the remodel is done, he’ll go back to his old spot (and if he doesn’t, he’ll be forced to. sorry, buddy). Yep, the zebra rug is still there (if you haven’t figured it out by now, remodel = expensive). But look – we got a coffee table! It belonged to my mother-in-law’s parents and  it was hanging out in her garage, waiting for a home. It’s a little wobbly, but usable and we love it.

The electricians were here early in the week, finishing up with socket placement and all the other wires for the fridge, and lighting. The outdoor sconce placement was discussed, decided on and marked.

IMG_8876 (600x800)The inspections went well (to my knowledge), but they did insist that we install new smoke detectors throughout the house. We had battery operated ones, so the guys took those out on Wednesday and put in new ones upstairs and downstairs that are hardwired throughout the house. We also had to purchase a carbon monoxide plug-in.

IMG_8895 (600x800)The laundry chute was relocated. Old location is the lower rectangle, new location is the higher rectangle. It will still be accessible, but via a cupboard instead of on the backsplash, where it was before.

(Note: see the hollow area to the left of the laundry chute? That’s unused space under the stairs. Wish we could’ve figured out a way to use but…alas.)

IMG_8904 (600x800)

Standing in the family room looking at the kitchen.

IMG_8902 (600x800)

There will be built-in shelving on either side of the fireplace.

IMG_8901 (600x800)

Standing in the kitchen, looking at the family room. Fireplace on right.

Finally, some light! With the drywall up, the room is instantly brighter (and what the heck color to paint the walls?!? STILL trying to figure that one out. Any ideas?).

IMG_8906 (2) (600x800)Why use a ladder when you have stilts? Drywall was prepped today (I think they’re done? I’m not 100% sure).

Next week is going to be an exciting one….cabinets arrive! Also, I think they’re going to put in a zippered wall (vs. a cardboard and Visqueen wall that obviously we can’t walk through), which will be possibly even more exciting than the cabinets at this point because I am freezing from having to walk all the way around the house to get to the basement (laundry, filing cabinets, printer, random boxes – all of which I use often). It was 34 degrees this morning when we took the girls to school. Yikes.

Which reminds me of another thing I’m looking forward to when this project is done – getting to use our heated garage. My car has been parked outside during the remodel and it is cooooold in the mornings. So much to look forward to (and so thankful that these are my hardships at the moment).

 

 

One thought on “Kitchen Remodel – Week Three: Inspections, Insulation, Drywall

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s